Design a Power BI report around the shift team’s question
A large red number is of little help when a shift lead cannot identify the station that needs attention. A useful report connects the exception to a station and then to the underlying events.
Which station should the team open first?
In this example S1 rejects 12 of 600 inspected parts, S2 rejects 8 of 100 and S3 rejects 1 of 10. S1 leads by lost units while S3 leads by rate. One more rejected part among the ten inspected at S3 would change its rate by ten percentage points. Show rate, rejected units and denominator together. Prioritising volume loss and investigating unusually concentrated defects are different tasks.
| Station | Rejected | Inspected | Rate |
|---|---|---|---|
| S1 | 12 | 600 | 2% |
| S2 | 8 | 100 | 8% |
| S3 | 1 | 10 | 10% |
Configure the path to the detail page
Create a station detail page and add the key from the station dimension to its drillthrough fields. The source visual must provide that key in the selection context. A table row with StationCode makes a simpler first test than a bar grouping several stations. Show station, shift, data timestamp and event list on the target. Provide a back button.
If the target should inherit the selected shift and reporting period, review the keep-all-filters setting. Inspect the filters that actually arrive. A slicer on the destination can further narrow the selection and produce an empty list. Explain that state to the reader. Eight rejected parts do not necessarily produce eight defect reports either: a single part may have several defect codes.
Station Label =
SELECTEDVALUE(Station[StationName], "—")
// Separate measure
Inspected Units = SUM(Production[Inspected])Create the two measures separately. Station Label displays the name when there is exactly one distinct station name in scope. Continue to use a unique key for navigation. Two stations in different plants may share a display name.
Test the decision path as a reader
Start at S2 and navigate to its events. Can you still tell that the eight percent is based on 100 inspections? Test a change of shift, a multi-selection and the route back. A drillthrough button should make it clear when a unique selection is required. Check tab order and reach the button using the keyboard alone.
Use colour as a secondary cue and keep numbers or labels visible. Write meaningful visual titles and alternative text. A practical acceptance test is whether an unfamiliar reader can reach the relevant events and correctly describe the comparison population.
Accept the page with three concrete tasks
Ask a shift team member to find the most lost units, then the highest reject rate, then the detail events for S2 without help. Record the chosen station, the denominator they report and where they hesitate. The answers S1, S3 and S2 with 100 inspections test different capabilities of the report.
If the S2 detail includes all plants, inspect the uniqueness of the station key and the relationships to the event table. If the events are correct but the reader cannot identify the shift, the destination probably needs visible context. Both problems might be reported as “drillthrough is broken”, yet they need very different repairs.
Try it yourself
The team wants to investigate the greatest number of lost units. Someone starts at S3 because it has the longest bar. What would help them decide?
Show the solution
Offer rejected units and the number inspected alongside the rate, with an appropriate sort option. S1 accounts for 12 of the shift’s 21 rejected units. S3 accounts for one. S1 is the useful starting point for a volume-loss review.